Greater Hume Shire Council

Greater Hume Shire Council

A large upgrade project was started for the Greater Hume Shire Council in 2018. JRC Electrical installed and connected new equipment as part of the Walla Walla Subdivision and Padmount Transformer Upgrade.

Existing Essential Energy high voltage infrastructure had to be accessed via two power outages. We installed and connected a new pad-mounted transformer, underground high voltage cabling, overhead low voltage cabling and upgraded the power pole, as well as a new subdivision with pillars and street lighting.

Our thanks to Mitra Drilling for the under-bore works within existing underground high voltage cabling and assets.

After months of hard work, we were pleased to receive positive feedback from Essential Energy congratulating us for successfully delivering such a large project.